Substations VAJ 18 and VAJ 2
The TET Estel company participates in the design and reconstruction of the infrastructure of the tram line in the direction of the Kopli district.
The traction substations VAJ 18 and VAJ 2 were fully equipped with equipment manufactured and supplied by TET Estel.
In addition to the delivery of the equipment itself, the company carried out commissioning, acceptance tests, commissioned the distribution of:
- AC devices
- DC switchboards
- Equipment for monitoring, protection, measurement
- Transformer equipment
- Cabinets for own needs
- Operative current cabinets
During July 2017, it is planned to conduct high-voltage tests at the facilities and equip the equipment of the VAJ 17 substation in the depot of Kopli.